Tuesday, 26 September 2023

The cockpit looking a lot emptier than for a long time and making a start on the rest of the bulkheads that need stripping back.

Now that the cockpit has been de-cluttered of the old plywood lockers on top of the areas either side of the sliding hatch it makes it easier to plan how to re-design the areas to make them more user friendly for the new owner to use in the future. 


One idea is to leave them clear and put nothing back in the areas, however, the new owner is thinking of re-signing the area above the steering position to place new instruments in a pod on the area just ahead of dashboard for some low lwvel instrucments to be fitted, a job in progress at present. 


Now back to the best job of all. stripping varnish off the old bulkheads and getting back to the original surface which is in reasonable condition given the neglect it has had over the past few years. After the varnish stripped from this bulkhead it showed that it was just badly varnish over the years without going back to the bare wood and doing a good re-varnishing job on it years ago. However, it can be seen as blessing in some ways.


 

The strip out of the Hardy 25 almost complete

Now with the last three bulkheads out of the boat which has many that can come out without dismantling the steering position the interferon is almost completely dismantled. 


The cabin hull linings in the cabin are now completely removed to expose the hull and the fixings for therope fender rails which have to be removed soon.


The last time this boat was stripped down to this point was when she was being build over 30 years ago at Hardy Marine.


The boat now looks very empty, however, there are a few more jobs to do with the interior, such as cutting a hole in the top of the water tank so that it has an inspection hatch so it can be cleaned and the inside of the water tank can be inspected for any damage.


The port side cabin to cockpit bulkhead has also been removed so it to can be stripped and sanded and stained to match the rest of the bulkheads and doors and tables which have already been stained and varnished as part of this major refit.


A large void space which will need a bit of tidying and a further cleaning down before any reconstruction work can begin 


 

Friday, 22 September 2023

Finally the decks and cabin roof are sanded apart from the edges where they need hand sanding to get this job finished

Finally sanded back all the filler so the decks are smooth and fair and just need hand sanding around the edges and where the D.A. Sander can not fit.


The job as taken a while to get all the areas as flat and smooth as possible. 


now it will need to be cleaned with solvent to degrease the surface before the final coat of epoxy primer is applied













Just got to hand sand the small areas 

 

Tuesday, 19 September 2023

Fitting the seacocks and taking a birds eye view of the varnishing production line

Finally got the seacocks fitted in the Morgan Giles 30, one less job on the shorten job list on the boat.  


Now they are fitted the rest of the heads compartment can be finished off with the fitting of the sea toilet and the other fixtures and fittings that are going into the head compartment.


A bird's eye view of the long varnishing production line for the Hardy 25 bulkheads and doors which are going through their stages of varnishing until they are ready to go back in the boat once the rest are scraped and stained and varnished to look like these.


The next jobs to do on both boats is t sand the decks of the Morgan Giles 30 and strip out the last few bulkheads out of the Hardy 25 and also the carpet linings off the Hardy 25 hull and so they can be patterned up to glue new carpet and cabin side linings once the hull and cabin sides have been cleared of any old glue off the hull and cabin sides.

 

Thursday, 14 September 2023

VARNISHING PRODUCTION LINE

Now that we have many of the major varnished parts off the boat it is time to get a production line set up to varnish all the panels at the same time and build up the layers of varnish at the same time.


The first coats of varnish after all the panels na bulkheads f=have been given a single coat of stain to help keep the colour of the panels and bulkheads for a longer period of time and cut down on the fading of the bulkheads and panels over the coming times.


The toilet door and cable box after they have been stained 


Now with their first two coats of thinned Epifanes varnish 


The same treatment on the two tables, the main cabin table and the cockpit table.


Now with their first two coats of varnish, building up the layers until they have enough layers