Thursday 14 September 2023

VARNISHING PRODUCTION LINE

Now that we have many of the major varnished parts off the boat it is time to get a production line set up to varnish all the panels at the same time and build up the layers of varnish at the same time.


The first coats of varnish after all the panels na bulkheads f=have been given a single coat of stain to help keep the colour of the panels and bulkheads for a longer period of time and cut down on the fading of the bulkheads and panels over the coming times.


The toilet door and cable box after they have been stained 


Now with their first two coats of thinned Epifanes varnish 


The same treatment on the two tables, the main cabin table and the cockpit table.


Now with their first two coats of varnish, building up the layers until they have enough layers



No comments:

Post a Comment