Thursday 3 January 2019

A other busy day with a number of jobs getting done

The deck sheathing coming along well with just the fore deck area to sheath in the morning 


When that is done then the deck can be over coated with a second coat of epoxy to give the deck added protection and then it can be primed and then the deck can get its coat of fresh deck paint.


Preparing the bottom to get antifouled with a fresh coat of black antifouling ready for the new season 



While it is in the workshop it is getting its annual service with new belt and water pump impeller and fresh oil and oil filter and a new fuel filter. 


Once this is all done then it will be run up and checked over.


Before it goes out of the workshop it will get a good polishing on the hull and have any paint work repairs done as well

No comments:

Post a Comment