The decks are all but one piece left to do on the aft deck and the edges have to be planned and radius then the patterns made for the sheathing material

The deck now getting the joints and screw holes filled and when cured will be sanded flat ready for pattern making for the sheathing material.


All the deck will be cleaned down so that the epoxy resin will go on to the deck and seal the surface when the matting is applied to the resin on the deck.


The piece of deck to be glued down and when fitted the whole of the deck will be ready to sheath.