Monday, 3 September 2018

The aft cockpit bulkhead has now been removed ready to fit the new bulkhead and rebuild the cockpit

The aft bulkhead in place before removing it to install a new marine plywood bulkhead in its place  


The bottom rail which was the back support for the cockpit floor which be beefed up to make it stronger to support the area of the cockpit floor 


The bottom rail removed after it was find to not be held there by much at all


The top edge is cut away so that the new bulkhead can be fitted to the under side of the cockpit coaming



The top edge now removed so to be able to fit the new bulkhead to the deck beam



The bulkhead now all removed and the reconstruction can begin 


No comments:

Post a Comment