The plank is now dry fitted and is getting its first coat of primer before getting fitted in the bottom.
Then it will be the turn of the stringer to get fitted and I have made the joint
Starting to cut the second half of the joint for the bilge stringer and then it can be fitted after the plank is fitted and nailed in position
One cabin side all sanded back and now a start as been made on the other cabin side
It is coming up well and once finished it will look as good as when it was first built 45 years ago.
No comments:
Post a Comment