Tuesday, 15 July 2014

Finally got round to finishing off the new deck or at least dry fitting it.

Starting to fit the new side decks to the dinghy after a long break doing other boating projects.
The port side deck when on first.
 

Then the starboard side deck was glued down and then it will be time to trim it up with the trimming router when all the deck is glued down.

Fitting the two parts of the fore deck down the centre line 

Now screw fixing the deck down along the gunwales

Starting to fix the two pieces of deck on top of the transom.




All the deck dry fixed down ready to glue down after the front bulkhead is glassed into position.


Bulkhead all masked up ready to epoxy glass it in place.

No comments:

Post a Comment