Making a new box for the New switch panel for the boat.
The new switch panel ready to go in the box once it is finished and shaped up to fit and then take to the boat to fit to bulkhead.
The first two port holes dry fitted on the starboard side
The two on the port side done as well and now just the two front ones to do.
The stem is now cleaned out and the fixing are removed and it is a matter of cleaning out the inside behind the plank ends from inside and the refitting them to the stem with fresh screws and sealant to make it watertight again.
No comments:
Post a Comment