Wednesday, 15 April 2020

Cornish Crabber repars getting underway with the centreboard re-instating

Grinding down the bottom edge from its full thickness to a 3 mm edge so that it can be glassed up back in position after the hull side is grind back the same way. 


Then the edges will be re-glassed into position  using the original layup that was used when she was build, however, this time the centreboard plate will have a larger pin and the centreboard will be reinforced in the area of the centreboard pin and along the joint where it was cut out of the boat.


The bottom of the hull needs a good clearing out and then I can start grinding down the hull in the area of the centreboard case so it can be glassed back into position.


Then I will be starting to build the chain locker bulkhead and fit the deck beams 

Lazarette locker rebuild and new tank bases

Fitting the new panels in the lazarette locker, one alreadsy fitted and the other panel laid on top and then marked off 


Marked off and set out ready to sort out the position of the tanks 



Both panels sanded down and the edges planed ready to be painted 


The first coat of Yacht primer on the face side and when dried turn them over then paint the other side and then paint them with a coat of grey bilge paint before fitting them in position  


Now its time to fit the first of the four deck fillers for the fuel and water tanks 


Tuesday, 14 April 2020

The start of Mai Star II's Latest refit

The hull is in a good sanding back and the seams need attention as much of the old putty as come loose and is in need of re-puttying and in places needs recaulking 



The froward part of the foredeck beams are in good condition the aft deck beams are in a poor condition and will need replacing 


The major part of the work will be to renew the gunwale /beam shelf which is in a poor condition where the chain plate is and the upper part of the sawn frames in the same area 


The starboard side is not to too bad it just needs a bit of tidying up and a few small parts replacing 



The camper van panel repairs

As before you can only repair a section at a time until you get back to its original shape and the start the rebuilding of the major parts so that they all line up back in the original position 

This photo is showing the rebuilding of a piece that was completely missing and have to reshape the area


The same job here rebuilding where there are pieces completely missing 



Tuesday, 7 April 2020

Not a boat, but we do other things when we are asked to repair GRP bodies of camper van's

The first job was to cut out the fractured Fibreglass from the vertical crack to release any tension in the area and let the shape go back to its original position before rebuilding the body work 


The same is done to the lower crack so that it can be moved back into itsd original position and then held there while it is repaired 


The side panel is cleaned up and the loose parts removed and then put to one side so that the pieces can be cleaned up of the old sealant that they were held together with and so the parts can be repaired with the parts they were originally from 


These two parts show how much is missing and how much as to be rebuild  



Repairs having to be done to this part before the other part which is still on the camper is repaired and matched up with this part  


A fair bit of reconstruction needed here to line up the two parts of the side and back panels 



cleaning up the back end of the side panel where it connects to the back panel 



These small parts getting cleaned up so that they can be positioned to be repaired and reconnected to the part they were originally connected too.




Cleaning up the areas which will be fibreglassed back together 




Because they very lightly build the only way to hold them in position was to masking tape the section together so weight was put on the joints and push them out of position  




Fibreglassing up the breaks and the broken pieces so that the next stage of rebuilding can take place, once the parts have cured off and the nexy part of rebuilding the missing parts can get underway.