Thursday, 17 September 2020
Mast and lifting keel support post being made and glued together, once the glue cured it will be profiled and glassed in position
New project boat which has come to the yard to convert this pulling boat into a motor launch
It was full of the last owner equipment which will be got rid of over the course of time, much of it will be recycled or used in some way, however, not put in landfill
The builder plate, showing it was build in 1995
The old equipment now removed and put in storage and now a plan of action to be set out to remove some items from the inside and what needs to be put in position to fit the engine beds and stern tube and make a new rudder and skeg and propeller guard
let the fun begin now the boat is empty of the old equipment and a blank canvas is before us to convert the boat.
Wednesday, 16 September 2020
Removing the carlins and seeing how far the rot as gone and how much more as to beremoved to get to sound wood.
Apart from the old iron fixings there appears to not be much wrong with the beam shelf that a small piece of grading will not put right
This is the only small area that is in need of repairing
The top of the transom looks like it is going to need renewing as it is in a poor condition on the starboard side, so before any work is done on the deck. It is going to have some major work done to the transom
Mai Star II carlins being removed after being measured so that they can go back in position once the cabin sides are removed and so have the put the deck beams back in position without any cabin in the way
The carlins beams position were all measured before they were removed so we know where they all go, so when rebuilding the deck structure they will all go back in the same position
Both ends of the short beams that are fitted to the beam shelf are fitted with a half dovetail joint which is the way they are going to be refitted
The wood on top of the beam shelf is all going to be replaced with new hardwood so that the deck beams and deck will have a good sized area to get fixed to when it time to relay the deck
The forward part of the deck is good condition just needs to be faired up after the new top strakes are made and fitted
The Cornish Crabber centreboard case glassed back in position, Now the reinforcing webs haveto be designed and glassed in and the ends re-enforced to complete job.
The lay up is over the original to ensure it now part of hull once more
The next job is to make a post to stand up the front face of the centreboard case to support the mast and to attach the centreplate lifting gear to as well

























