One part of this Covid19 situation, it gives me time to clean up the workshop and put tools and equipment away and do jobs I have been putting off, now that I have no reason to put off anymore. Another job to sort out the workstation management better to make tool stations more user friendly and less inefficient by placing the tools within arms reach and have dedicated areas for each piece of static equipment. So tomorrow when I go to work and because I work by myself I can self isolate and keep working on my client's vessels and keeping my business turning over at the same time. So although it is a difficult time for many people, those of us who work by themselves can keep working and fulfilling our work for our client's through this difficult time.
Sunday, 22 March 2020
Friday, 20 March 2020
New fore hatch plinth construction
Having cut and planed the outside edges of the forehatch plinth it was the turn of the inside, first cut away the excess wood with a long bladed jigsaw blade
The spoke shave the inside edges back to the scribed pencil line
The finally fix to the hatch to the plinth to ensure the correct shape before routering a curve on the top of the outside edge
The next job is to profile the bottom surface to the curve on the cabin roof.
Thursday, 19 March 2020
Fore hatch now going into the cutting to size and shape stage
Now that the glue as cured it was time to plane the joints level and the mark off the areas to cut
All marked off and ready to cut the outside edge to the correct line and the n do the inside once the outside edge is planed down to the scribed line
The outside edge now cut and ready to start the planning back to the lines
Wednesday, 18 March 2020
Starting on rebuilding the centreboard case of Cornish Crabber
Mark out the distance from the cut on the centreboard case and then grown off the flowcoat and dirt from the case. So then will be able to mark off the gradient to make the cleaned off area so that the lay up of the new CSM on the joint to rebuild to the original specification
A lot of grinding ahead to make it ready to fibreglass it back in position
Camper van repairs
Like boats you haveto start by taking the inside to pieces to get to the inside ofany repair
The damage on the outside is half above and half below so it means having to cut small inspection doorways in both areas
The length of the repair is
The panelling under the seat which have a hole cut in it to gain access to the inside of the damage
Subscribe to:
Posts (Atom)














