Thursday, 5 July 2018

Starting to lay up the matting on the shower tray plug to mke the custom shower tray for the Hardy 25

The first layer of matting on the plug to make the custom shower tray, now just four more layers of matting then will be able to release the new shower tray off the plug


Using quad directional matting to go round the complex corners on the plug to ensure the matting lays in the corners  



Wednesday, 4 July 2018

The final piece of the jigsaw puzzle of the first layer of plywood deck.

The final piece of plywood deck and now it is a matter of trimming it and fitting it down with glue and screws


a neat fitting round the Samson post


The deck are now ready to be trimmed and fitted and then the second layer of deck can be fitted.



Tuesday, 3 July 2018

Making patterns for plywood deck and cutting out plywood ready to dry fit later

First job this morning was to make all the patterns for the plywood decking out of 3 mm plywood and then mark off the edges of the cabin side and the hull edge


All the patterns made and now ready to cut the plywood out to make the deck panels 


Marking out the deck panels 


Cut roughly to size with a small amount of trimming to be done to make them fit the edges of the coaming and cabin sides and the top of the transom


One side deck cut and just needs cutting at the ends to fit the other piece of plywood and by over a deck beam as well


Just one more panel to make for the port side deck and then on to the foredeck panel



Monday, 2 July 2018

work underway on the Classic 1930's yacht with the planks being re-fixed

The classic 1930's getting its new planks fitted  

The two short pieces of planking getting re-fixed into position


Because of the slight twist in the planks it is necessary to shore up the planks into position while fixing them with bronze screws and copper nails   



The second side in position 


Then the next job was to bore the holes for the shaft log through the hog and through the new planks so that the drill bit as a guide to run through to use to bore the holes for the bolts that are going to fix the shaft log in position while the stern tube hole is bored in the shaft log. 


The corner post is now re-fixed in the corner of the cabin and this should stop the leak in this corner of the cabin


Sunday, 1 July 2018

Gel coating up the plug

This is the second coat of gelcoat on the plug, so just got to let this one coat go off and then give it its final coat of gelcoat before starting to lay up the matting.


A lot of work to make a plug to make a custom mould, however the end result will be worth all the hard work getting to this stage 


When it is finished being laid up and release from the plug the next job will be to fit it in the toilet compartment and pump in the shower system and Formica the bulkheads and flowcoat the fibreglass areas of the shower/ toilet compartment