Monday, 16 April 2018

Busy Monday morning down and the boatyard and workshop

engine serviced and heat exchanger replaced and now ready to put back in its yacht.


The yacht it is going back into and the recommissioning the yacht and the engine over the next few days.


All change in the workshop with the Shetland Black Hawk outside ready to commission the engine and connect up the steering. 

The clinker workboat is not repairable so it is being stripped down for spare and then will be disposed of  


A fishing dory in for some large bit of TLC and a good clean down and a glassfibre repair to the hull.


Sunday, 15 April 2018

Updates to my J Star Boat Services website

Just updated my jstar boat services website to show what new projects the company are presently undertaking and the exciting job opportunities for a young person to become a boat builder within the company. The photos are of projects currently undetaken be the company. The work is challenging and varied and no two days are ever the same. So if you feel you are up to the challenge, call Simon on 07585506960 or send him your C.V. to jstarboatservices1@gmail.com.

Saturday, 14 April 2018

The fuel tank is now removed and in the workshop to be inspected to see what can be done with it.

The fuel tank is now out of the boat and in the workshop to inspect the bottom of the tank to see why the bottom was fibreglassed over.


The inside of the fuel tank to try and clean out. If it can it would be good if after inspecting what is under the fibreglass matting does not give us any headaches.




Friday, 13 April 2018

A busy end to the week down at the boatyard and the workshop

The end of the week saw a few boat movements, which included getting an old harbour launch back to the yard to be broken up as it had come to its end of its life as a sea worthy boat. However, it is going to be used in a garden as garden furniture. So it will live on in a different place other than the high seas.


Another job that was put off until the end of the week was removing the fuel tank out of a motor cruiser we have in for a refit. The tank had a n amount of fuel in it which when it was removed was find to be contaminated with a black jelly like material. So next week got the  not very nice job of steam cleaning the tank out and deep cleaning the tank to get rid of any material in the tank that will cause it to return in the future.

During the week the engineering team  turned their hand to serving the brake system on a client's trailer. When it was stripped down it was found that the trailer had no brakes inside the drums and the activation levers that operate the brake shoes was a seized pile of rust which had to be brought back to life with a good bathe in diesel over night before going about freeing up the lever. After that it was the turn of the brake drum to get the treatment of cleaning off the beariing surfaces of the brake drums to ensure that the brakes when applied were going to work as they should.

The engineering team had to servie a small motor from a client's yacht that had a fault on the heat erxchanger that needed the part replacing and a full engine from top to bottom with all the filters and oils renewing as well as the v belt and one of the engine mount which had turned to a rusted unadjustable mount.

The other motor boat in the workshop is getting a few more bits added to the list of job, however, it should be finished by the end of next week and be out on the water the following week with its new owner ready for the coming sailing season. So allin all it as been a busy week and there are more to comning over the next few week.

Tuesday, 10 April 2018

Engine repairs by J-Star Boat Services Marine Engineering team

A Beta marine 13.5 hp diesel inboard in the workshop for a new heat exchanger as the old heat exchanger  front end plate was leaking and could not maintain a seal between the end plate and the body of the heat exchanger


So it was time to remove the faulty part from the engine after the engine had been removed from its yacht. the reason it could not removed in situ as there was not room to slide the heat exchanger off its stubs.


First job was to remove the v belt off the front of the engine so that the alterntor can swing out of position so that the heat exchanger can slide off its stubs  




The old heat exchanger off its stubs 



even new bits come with their own imperfections, this one being a bit of weld keeping the heat exchanger from sitting correctly on the engine block making it impossible to seal when bolted down in place



One of the engine feet was rusted away so could not be adjusted which when you are alining the engine is not good.


The New heat exchanger now in place and the engine just needs its oil and fuel filters and oil changing and it can go back in its yacht.