Thursday, 13 November 2014

Getting to grips with putting in the new ribs singlehandedly and new planking made and ready to refit in bow

Getting to grips with putting in the new ribs singlehandedly with the aid of a roofing prop

After refitting the new ribs then the beaching leg backing pad was able to be refitted.
 Two of the three new planks cut and thicknessed and ready to go back to the boatyard and be streamed to shape

Using the small stream box for the short planks.


Monday, 10 November 2014

Productive day on Mai-Star II

The three planks on the starboard side that were causing a number of problems with leaking water passed the stem joint.

The main problem being that the fixings on the stem had given way and the ends of the planks were damaged by repeated attempts to refix the planks .

The three planks have all got scarf joints cut on them so it is just a matter of making up the new short lengths of planking and refixing them in place after the old fixing holes are plugged with wooden dowels 



The first two ribs refitted in place now have to nail them and the rove them.

The third rib in place and just got one left to do on that side in the cabin.

The electric circuit panel powered up and ready to fit the rest of the instrument wiring to it 
.

Tuesday, 4 November 2014

Restarted work on the Restoration of the 1960 Enterprise dinghy

The first job to do was to remove the excess glue off the underside of the deck.

The next job is to sand down the inside the boat and also the centreboard case

This should be lots of fun 

Cutting out the new centreboard case support knee 

The knee all finished and ready to put in position 

Dry fitted in place before giving it a coat of varnish before fitting.



Friday, 31 October 2014

Going to be a busy week next week with a many of project getting underway again after a summer lay off.

The following couple of weeks are going to be busy with a number of projects being restarted after a summer lay off and the owners wanting to get their boats back in the water or at least finished off before the weather changes and no work can be do on them.

Wednesday, 15 October 2014

The weather as turned so the work is on hold for a while.

As the weather as turned for the worse the work on Reveller as come to an end for a while. However if there are a few days of settle weather then we will get on and get a few more planks on and even a coat of paint on the hull and bottom over the coming weeks and months.