Getting to grips with putting in the new ribs singlehandedly with the aid of a roofing prop
After refitting the new ribs then the beaching leg backing pad was able to be refitted.
Two of the three new planks cut and thicknessed and ready to go back to the boatyard and be streamed to shape
Using the small stream box for the short planks.
No comments:
Post a Comment