Saturday, 28 December 2013

Boat Maintenance tips for a stress free fitting out time


Boat Maintenance tip # 4

When the weather is gets better it is time to start getting the boat ready for the new season, so make sure you have all the necessary gear to do the jobs, if not order them now through our mail order service

Boat Maintenance tip # 5

Get your charts send to the chart agents to be checked & corrected if needed, also next liferaft checked and or ordered from hirer for new season

Boat Maintenance tip # 6

Check your standing & running rigging before the start of the season better to be sailing than sitting on the hard all season waiting for a new rig

Thursday, 26 December 2013

Boat maintenance check list for stress free winter refit.

Boat maintenance tip #1

Get refit list checked and order your antifoul this week in time for getting the boat in the water for Easter

Boat maintenance tip # 2

Check your sails are in good condition and if in need of repair get them to the sail maker this week before the rush for Easter starts

Boat maintenance tip # 3

Remember to book your launch date now as time is running out to get your boat on the date you want to be afloat

Wednesday, 18 December 2013

Closing down for the Christmas break and will start again in the new year!

Today is going to be our last day at work until the new year and I would like to thank all my clients for their business this year. It has been a difficult year, but there has been some points along the way. So until next year, wishing you all a Good Christmas and hope to see you all in the new year.

Monday, 16 December 2013

The next three planks get steamed and bend into position

This photo shows the front end of the planks as they are steamed and bend into position and left to go cold before taking them off and cutting the plank ends to fit the stem and plane the rebates on the plank to fit the plank below.
This photo shows the planks amidships where the boat is starting to take shape and the hull is starting to look like a boat.
This photo shows the planks starting to build up round the transom of the boat.

Thursday, 12 December 2013

The third phase was to start to fit the bulkheads in the toilet compaprment and dry fit the new windows

The first job that had to be done was to repair the damaged window surrounds that had been damaged when the old windows were taken out to be replaced.
This work had to be done to a number of the windows down the startboard side
Much of the problem was caused by the lay up not being thick enough around the window surrounds leading it to break.
Once the repairs had been done to the window surrounds then the new windows started to be fitted back in the window surrounds
Then the first side was dry fitted and then it was the turn of the other side
Once these were done then the front windows were fitted in place.
While the windows were being fitted the toilet compartment bulkheads were being fitted .
In this photo the front and aft bulkhead panels are fitted in place before they are lined with formica.
This photo shows the bulkhead that fits fore and aft to leave the piece for the doorway.
Another photo of the front and side bulkheads in place before being removed to be covered with formica and then fitted back in place with oak trims in the edges.