Thursday, 12 December 2013

The third phase was to start to fit the bulkheads in the toilet compaprment and dry fit the new windows

The first job that had to be done was to repair the damaged window surrounds that had been damaged when the old windows were taken out to be replaced.
This work had to be done to a number of the windows down the startboard side
Much of the problem was caused by the lay up not being thick enough around the window surrounds leading it to break.
Once the repairs had been done to the window surrounds then the new windows started to be fitted back in the window surrounds
Then the first side was dry fitted and then it was the turn of the other side
Once these were done then the front windows were fitted in place.
While the windows were being fitted the toilet compartment bulkheads were being fitted .
In this photo the front and aft bulkhead panels are fitted in place before they are lined with formica.
This photo shows the bulkhead that fits fore and aft to leave the piece for the doorway.
Another photo of the front and side bulkheads in place before being removed to be covered with formica and then fitted back in place with oak trims in the edges.

Wednesday, 11 December 2013

The refit continues with a good compounding of the hull and a clean out of the inside.

So the hard work begins with the hull being given a good compounding and removing of some of the bad marks the boat as got over the years especially the one it has got on the port side amidships. In the first photo it is cleanly seen.
In the second photo it is gone as if it was never there in the first place.
The same it true in the next pair of photos the cockpit in a dirty state and then
In the next photo the cockpit carpet and the surrounding area is given a good vacuuming and makes it look at lot better.
The starboard side is given a good compounding and it bring up the true colour of the hull.
This photo is of the inside of the cabin with it given a clean up and sorting out of the cushions and table into the correct storage positions.
The table when not in place as a double bunk infill is placed on the locker opposite the galley/sink area.

Now the rest of the refit can continue with the rest of the jobs on the refit list.

The second phase of the P{rincess 25 refit

The next phase of the refit was to seal up the window holes to keep the weather out of the boat while the new windows were being made and so that work could continue on the inside of the boat.

At the same time the hull was compounded to give a good look at the hull and see how much work the hull was going to need to bring it back up to a good condition.
This is a photo of the forward end of the main cabin giving a good look at how the front as been brought back to a good condition after a good deal of cleaning and polishing as been done .
The main cabin under the floor and in the lockers as been painted out with white bilge paint to lighten up the cabin and make it easier to find items in the lockers once the boat is back in commission.
A photo looking down the port side looing forward.
A photo looking down the starboard side looking forward
This photo shows the area in the toilet compartment where the seacocks are is painted as well.
The next phase is to put the new bulkheads in the toilet area and sort out the tanks and galley area.

We do refits on Hardy Marine boats

We get asked from time to time to work on Hardy Marine & Princess yachts boats. Having for many years worked in the marine industry. I have come across a number of these boats and done work on a number of their product boats. I have a great deal of knowledge of Hardy boats having worked for them for 7 years during the 1980's. Also while working for another company worked on a number of the Princess yachts range of boats especially the smaller Princess from their product range. Therefore having a good deal of knowledge of their boats and how they are put together and how their systems work.

So when asked to do work on these boats it is easier to work on these boats.

The first Hardy boat I am presently working on is a Hardy Navigator 18 which is in need of a good deal of TLC and general tidying up as it has been left to go a little.

This photo is of the outside of the boat after it had its first session with a compounding machine and the difference it made getting rid of years of dirt that had build up over the years.

This photo is of the port side after it had been given the same treatment, but side is need of a great deal more work as it as damage to the hull gel coat amidships that needs reworking and being back to looking like new once more.
This photo shows the condition of the cockpit wiring down the starboard side, just hanging down without being clipped up and made to good a professional job.
This photo shows the condition of the cabin doors and how they have weather from leaving the cockpit cover off and letting the weather damage the varnish on them
This photo shows the condition of the back of the cockpit where it is in need of a bit of TLC and re-organising
This photo is of a view of the cockpit showing that the boat is in need of a good cleaning up.
This photo shows that the window seal as given way and that the windows are in need of resealing to make them watertight once more
This photo shows how the rubber in the windows as become shorter over the years and is in need of replacing to ensure the window is watertight.
This photo shows a jungle of wiring that needs sorting out and making safe and easily managed in the future
The steering position is in need of a general sorting out and tidying up to make it more workmanlike able to be used easier by its new owner.
This photo shows the VHF which as been removed to get tested and if need be replaced with a more modern unit.
This is just the start of this refit and will be posting more photo and text about the work as it progesses along the refit.

Tuesday, 10 December 2013

So the second row of planks gets steamed into position.

This photo shows the front end of the plank being steamed into position along with its sister plank on the starboard side being done at the same time.
This photo shows the boat starting to take shape as it grow out from the keel.
This close up shows the plank in position on the stem and before the rebates are planned on after it as cooled down
The second plank being helded in place by old fashion peg cramps/
Another photo of a peg cramp being used to hold a plank in place.