Wednesday, 6 May 2026

Two more tired old dinghies in need of a new lease of life being given te J-Star Marine services restoration treatment

This old IP 10 has come in for a full make over starting with a good clean down and inspection of the hull before making a list of the works needed to be done.


Now that the inside has been cleaned out of any loose dirt it is time to turn her over and clean off the outside before giving the hull and good sanding down in preparation to have a couple of coats of epoxy hi-build primer applied to the hull to make it water tight and after any starglazing have been repaired 


So let the fun begin on this IP10 



Another dinghy brought in was a 14 foot bass boat which will need much the same treatment as the IP10 and seats and a forward deck and shelter fitting to the forward end.


 

No comments:

Post a Comment