The foredeck beams and the mast pad nw in position and so that part of the restoration of the foredeck is now completed.
The next part of the deck rebuild is to fit the carlins after the aft end of the cabin beams are made and fitted Once the aft cabin beams are made and fitted the carlins can be fitted and the short side deck beams can be fitted and the tie rods made and fitted between the carlins and the beam shelf so the side decks will be connected together.
The new side deck beams made over sized and ready to be fitted once the other jobs are done so that these short beams can be fitted.
The Pearly Miss refit is coming along with the PVC rubbing strake being removed and the old rivets all removed. Now can get to the other deck fittings which need removing so that they can be cleaned and stripped then recoated.
now the other deck fittings need removing so that the surface can get prepared to get recovered with a new deck covering similar to the original covering.
Now looking to source new deck fitting to replace the old fittings






No comments:
Post a Comment