When the Fairline Carberra 24 came to us the engine bay looked a bit of a mess with bits laying all over the place.
So the first job was to sort out what was going to be saved and what parts were going to go in Skip.
Now that the engine bay was cleared of all the mess it was time to get down to sorting out all the parts that were missing and replacing parts which were not needed anymore and doing cable and control line runs around the engine ready to put the engines back in place.
The first job was to make sure the engine were complete and any parts that were missing had been replaced and any final checks made before refitting the engines.

As you can see they are a close fit in the engine bay with not a lot of room around the engines to work on them.
No comments:
Post a Comment