Monday, 4 November 2024

Starting to sort out this mess, then make sense of this.

First remove all the loose items to get to the bottom of the engine bay and make sense of what we have to sort out first.


Sort out what is any good and replace what is needed to be renewed with up to date equipment.


These fuel lines will need renewing with new copper pipes so that they are both the same size.


The photo above as one size and this fuel pipe is a different size.


Someone did a good job on the gear shift and throttle cables cutting them off with a pair of bolt croppers  




 

No comments:

Post a Comment