The second of the starboard side bulkheads going back in position, just got to fit the new water tank filler pipe and vent and this bulkhead can be fixed in permatmently and then the galley unit can be mocked up.
The new teak faced marine plywood locker front and top now fitted setting off the cockpit with a warm feeling with wood rather than white paint plywood fronts and tops as before
The battery locker with its two part hinged top to gain access to the batteries and to check the charger and switch the isolator to its different positions
The new battery charger installed and just needs wiring up to the batteries and to the shore power with its own circuit breaker fuse.
With the wiring that was no longer needed it is time to rewire the original wiring in a more up to date manner and make it a more neat wiring system.
No comments:
Post a Comment