Monday 31 January 2022

Busy day of the Morgan Giles 30


Sealing the plug with a coat of epoxy resin and then filling and fairing the plug after it as cured over night 



radiused the edges to aid the bi-axial cloth to go over the edges to make a fair surface to be what will be the surface of the water tank which will be moulded off this plug.




Second filling of the main decks of the Morgan Giles 30 




When this has cured then the whole of the deck will be sanded down again and any final filling will be done and then the deck will be givenits next coat of Hi Build Epoxy primer 




The chain plate areas getting there second filling with epoxy filler which will be sanded and then the hull will get its second coat of Hi Build Epoxy primer as we build up the primer coats on the hull.


















 

No comments:

Post a Comment