The rest of the starboard thwart support is finally in position

 The rest of the starboard thwart support rail is now glued in position and a epoxy fillet is put along the top edge against the hull to aid the laying of the fibreglass over the thwart support. The original port side rail is getting cleaned up so that can get an epoxy fillet run along the top edge along the hull side of the rail to do the same job as with the starboard side. 

Once the fibreglassing is done the aft seating area can get covered with marine plywood on the front faces and the tops will be removeable lids to use the area under the seats for storage of warps and fenders and any other items the boat will need. 

Then the engine bed irons will be bolted in position and the the fuel tank support beams and the small fore deck will be made after the deck beams are made out of hardwood battens.