Monday 8 October 2018

The decks are now ready to have radius put on the outside edge and then glass over the deck to make them watertight

The outside edges of the main cabin deck is now planed flush with the cabin sides and just the radius to be put on with a router when the team are back in the workshop.


The new door trims are getting made so the when the repairs are done to the main cabin bulkhead at the base of the door way these new trims can be fixed and glued into position


Marking out the door threshold piece to fit on top of the repaired cabin bulkhead  