The three stages of rebuilding the steering console with the new upper console in position

The new upper console in position without the new instruments in position, it is however fixed in position 

The new instruments in position just need wiring up to the switch panel and the circuit testing to ensure the system is working correctly.


The lower console temporarily in position while the rest of the wiring is re-connected and then the console will be permanently fitted back in position, then the steering system will be re-made and connected up.


A lot of the work today as been behind the two consoles, so although it looks like very little as been done there as been a lot of wires re-routed through the boat and new wires run through the boat for new equipment to be fitted next week.