The berth fronts are now being looked at and found to be in a poor condition, so it is decided to renew the berth fronts with new plywood and carpets,
The galley locker is now back in position and is ready to have its edge trim renewed
The sink locker back in position and the bulkhead panel is now back in position
One of the angle brackets holding the berth fronts in position, in need of cleaning and reusing
The condition of the berth fronts is poor and in need of replacing
No comments:
Post a Comment