Tuesday 14 February 2017

Fitting the new steel frames and then the water tank on top of the new steel frames

The empty bilge area ready to have the water tank re-instated after the steel frames are fitted 


The steel frames fitted and now ready to fit the water tank over the top of the newly fitted frames


The water tank ready to go back in position 


No comments:

Post a Comment