Saturday 10 December 2016

Progress update on the Little Mai new build

 Starting  dry fitting the bow seat buoyancy tank   


Then glassing it in position 


Trimming back the edge of the matting while it was still in a semi cured condition  leaving a neat edge.


Setting up the stern seat / locker with a spirit level in both directions athwart ships 


Then fore and aft directions before getting ready to glass it in position.


No comments:

Post a Comment