Thursday, 17 November 2016

Now back to work on Mai-Star II with work on the Hull and deck and the new forehatch.

Now back to work on Mai-Star II with an inspection of the hull to see what is needed to be done first


The hull is in reasonable condition  just will need a good sanding before the painting can continue over the next few months


The bottom looks in good condition apart from a few gaps where the planks have dried out over the summer months.


The gaps in the planks will swell up with the winter damp condition and a little help from a hose pipe spraying  water over the planks on the inside 


The new forehatch being glued together, then it will be ready for the next stage cutting the rebate around the top to fit the upper section of the hatch.


No comments:

Post a Comment