Thursday, 26 March 2015

Starting touching up the paint work on the inside of the Mai-Star II

Rubbing down loose paint work on bulkheads and touching up the bare wood areas after masking up edges.
r

 It a just few places on the bulkhead

A whole lot more on the side of the hull and under the foredeck on the starboard side

most of the touching up was on the new ribs on the port side.

After these areas were dry I was able to get a second coat of varnish on the cabin sides. Also fitted was the end blocks for the bunk backrests, once the painting is completed then the blocks and the backrests will be varnished like the cabin sides.

No comments:

Post a Comment