Now that the days are at last longer, it will give me time to get on and get some of my own work done on my own yacht. Having got the cabin front fitted, it is now the turn of the cabin sides to get fitted in place and then join to two together and then get the roof back on and the roof sheaved again. However, this job will be done after the planking is finished off and the rest of the broken ribs have been replaced with new steamed one and they are all refitted. and then the long job of refitting the inside and the painting and varnishing to be done.
No comments:
Post a Comment