| Te hull of the Skiff rub down ready for revarnishing after the repairs were done |
| Same job of the foot board |
| Aft floorboards refitted after replacing broken ribs in back of boat |
| Outside of Revarnished with six coats of varnish |
| New oak Rowlocks |
| Repairs to end of Keel and Two new planks fitted |
| Another photo of the 2 new planks |
| The inside of the skiff given the same threatment as the outside six coats of varnish |
No comments:
Post a Comment