Thursday, 30 July 2020

The vast range of marine services we have on offer at J-Star Marine Services

From traditional wood boat building to modern boat construction  


Repairs to boats that major de-construction done to them. In this case rebuilding the centreboard case and strengthening up pivot point for the centreboard pin which was under spec before. The next job isto some major grinding of the inside of the hull round the centreboard slot in the boat before carefully re-building the lamination's to refit the centreboard case back in its original position and once it is in position re-enforce the sides of the centreboard from the side loading on the centreboard case.     


The long term refit of the Morgan Giles 30 which will be going out in to the yard so other boats waiting to come in the workshop can get their work done 


The cold moulded speed boat is now ready to be sprayed so it can also be removed out of the workshop and turned over and the deck and the engine can be fitted so it too can get back on the water 


We have apprenticed trained boat builders who can restore even the tidiest of classic craft back to their former glory


We even mould our own class of classic grp dinghy 


Wednesday, 29 July 2020

The Mai Star Class dinghy is now almost finished apart from small items

The centreboard is now fitted and just  a few more coats of varnish and a pair of quarter knees and a rudder to make.
Now complete with a pair of traditional oars  
The centreboard just needs to befitted with the fiction pad on the front face of the centreboard to keep it in its position when rowing or sailing 
Looking more like the Mai class dinghy  that was planned for as the tender for Mai Star II
Because it is going to be working dinghy basic fitting to be fitted to this boat, However, any of Mai Star Class will be able to be fitted with bronze fittings  

Tuesday, 28 July 2020

Fitting the Rowlocks to the Mai Star Class dinghy, getting one step closer to its maiden voyage

Marking out and masking up the new varnished gunwales and sheer strake


Cutting the first part of the socket for the rowlock plate to sit in


The first of the two plates fitted


The first rowlock now fitted, just the second rowlock to fit and then just the bow ring to fit on the top of the stem 



Monday, 27 July 2020

Short half deck beams and the amount of wasting on some of the nails on Mai Star II

The side deck half deck beams now out of the boat and labelled up. Keeping these as patterns for the new deck beams 

Looking a bit worse for weather, however, they have been in place for over 70 years, so they done their job.


They were half dovetailed into the carlin and the top of the beam shelf. 


All the dovetails were different, however, when they go back in they will be either the same as each other or as close to it as possible 



One of the frame nails that came out of the boat, this is the worse nail, However, seeing as this is going to be a major restoration of the boat, there is going to be a drawing of  a number of other frame nails to see if it is the same all over the hull.


Sunday, 26 July 2020

Plans for the weeks ahead

This coming week it is going to be a spilt between the Cornish Crabber restoration and Mai Star II's restoration. The Cornish Crabber restoration is starting to put items back together, such as the deck beams and the centreboard case. The main part to get refitted to move the crabber project ahead is the re-instating of the centreboard case as all the other interior fixtures and fittings are based off its position in the boat. So until it is fitted back in the boat the project can not go ahead. So the main job on the boat this coming week will be the re-glassing in of the case after grinding back hull in the bottom of boat where the centreboard was cut out by a previous owner who was going to change the boat into a shallow draft fixed keel yacht. That project as been scrapped by the present owner who wishes to return it back to how it was originally build.

On the Mai Star II restoration project, The start as been made on removing the damaged and broken frames and ribs on the port side forward of the mast position which at sometime in the past as been damaged. The next job in the boat is to take the old interior out and then remove the cabin superstructure off the boat and rebuild the cabin sides and front before refitting after all the deck structure is rebuild and the cabin structure can be refitted on to new deck structure. With the cabin and deck structure out of the way, it easier to sort out the frames and ribs that need replacing without anything the way. This restoration is going to be a keel to cabin top and from stem to stern restoration and replace everything that is in any way sub standard. So that's the plan for the near future.