Wednesday, 30 August 2023

Hardy 25 toilet de-construction as begun

In order to make it look and work as the new owner wishes to use the toilet compartment, there has to be a bit of de-construction first.


Removing all the old tiles and other linings in the toilet compartment first to get back to the base plywood and start to clean up the base plywood in order to make the new toilet compartment work as the new owner wishes to use this area.


The old tile were fixed on the bulkheads with no more nails and they did fix to the bulkheads firly well.


Getting back to the base plywood and fibreglass, it is heavy going in some places as the tiles and cork tiles have fixed well to the base plywood.


Getting back to the cabin side finally after a fair bit of work with a wide bladed chisel. However, we are getting there. 


 

Wednesday, 23 August 2023

Clearing up the headlining panels for the cockpit so that the new headlinings look smooth and flat.

In order to achieve a good smooth finish to the headlining material, you have to remove all the old glue from the panels so that you have a smooth finish to glue too.


The old glue is still very tacky and is picking up all the dust and small bits in the workshop so it is a matter of dissolving the old glue and getting rid of any contamination on the surface of the panels where the new material has to be glued to when they are recovered.   


The first of the cockpit headlining panels with the glue removed and just needs to dry off the solvent we used to remove the glue and then they will be ready to recover the panels when the cabin headlining panel have had the same treatment. 


 

Thursday, 17 August 2023

Starting to fit the seacocks to the Morgan Giles 30 toilet compartment

Having had the owner decide where he wish to locate the seacocks , it was a matter of cutting through the inner layer of fibreglass and the foam insulation to expose the outer hull. 


Both areas cut out and ready to fit the skin fittings once the packing pads are epoxied into position


The two seacocks in position, just a matter of mixing up soe epoxy with low density filler powder and setting the seacocks in their final position.


The seacock centres 


Now with the holes cut out to fit the packing pads in position with the thickened epoxy.


 

Wednesday, 16 August 2023

Restoring the old weathered cockpit table off the Hardy 25 and removing the old varnish and dark stain off the steering wiring box.

The old weathered teak cockpit getting a good sanding back to get rid of the old varnished and faded wood.


Giving the same treatment to the underside of the same table.


After a bit of light sanding got the original colour of the teak veneer coming through and will need a few coats of varnish to look like new again.


sanded down and now ready for the first coat of teak stain.


The first coat applied and the rich colour coming through once again.


Making a start on the steering cable and wiring box and giving it the same treatment as the table.


 

Tuesday, 15 August 2023

Photos of the old bilge pump which needs replacing and the unknown transducer and getting ready to remove the fuel tank to empty and clear the diesel fuel tank.

The old bilge pump which needs replacing as it as a broken outlet and is also too small for the boat.


An unknown transducer which will be checked out and if not needed will be replaced with a depth echo sounder transducer which will work and the present transducer does not give a reading 


The bird's nest of wiring which comes from adding wiring over the years and not removing the old wiring which is no longer being used 


Getting to grips with the fuel tank and removing the panels holding the fuel tank in place.


Just removing the fuel lines ready to get the fuel tank from under the side deck and the get the fuel out of the tank once it is in the middle of the cockpit and have access to the fuel tank