Now the long hand sanding starts with sanding down the areas that you can not do by machine
There is going to be a fair amount of filling and fairing to be done on both sides
Now the long hand sanding starts with sanding down the areas that you can not do by machine
There is going to be a fair amount of filling and fairing to be done on both sides
The boat is going to have to be moved forward and sideways to get down the port side
The port side before it gets its good hard sanding back to get a key for the Hi-Build epoxy primer to get a good bonding to the surface.
Just got to get the bulkhead hole cut for the area to be used as a warp and fender locker when the boat is finished
Masking up the areas where it will be glassed in position
The area in the aft end is getting smaller by the day.
The inspection hatch is also fitted so that the fuel tank pipework can be done with the fuel tank in position
The engine is finally bolted down and the work around the engine can be started
The aft bulkhead s now ready to be made and then the aft deck can be fixed down in position