The hull carpets are now cut ready to be glued back in position and the small bulkhead panel is covered in the same hull carpeting as it was originally done.
The gunwales and rubbing strakes are now down to their finished width and depth and will now have an routered edge put on the outer edges top and bottom
The floorboards are being made up and just need the edges run over with a router to take the sharp edges off them before they are made up.






















