A lot of grinding and sanding done, just a small bit left to get done over the next few days. Then I will inspect the hull to see where the weak spots are and repair these.
Friday, 6 November 2020
Cleaning off the old paint and flow coat off the inside of the hull
Wednesday, 4 November 2020
Clearing off the paint off the inside of the hull, so can see if there any repairs to be done before the floor bearers are fibreglassed into position
The hull is reasonably flat a smooth which is good as it should make fitting the floor and bed bearers a reasonably quick jobs
It is now getting there in the aft end of the boat
A long way to go
Tuesday, 3 November 2020
On the Motor Launch front, progress on sorting out the aft end of the boat with the removal of the aft seat
On the motor launch conversion project front, I have now taken out the aft seat, which in the end did not take much to remove apart from a few hidden screws put into the seat top which were put in from the outside and then covered with filler and paint. With this seat out it is now much easier to get to the last fixings holding the outer keel in position. The outer keel as to come off so that the stern tube can be fitted and a new profiled keel can be fitted ahead of the stern tube. Also at the moment the rudder fittings on the transom as to be removed and redesigned to hold a new shaped rudder.
At the moment I am grinding back the inside of all the old paint and fibreglass matting which was there from when the floor bearers were last fibreglassed into the hull. This time the floor bearers will be glassed in in a very different way and will also have a set of engine beds glassed in the hull. The extra fibreglassing will strengthen the hull and make it a lot stiffer.
So for now it is more power to the grinder and get the inside all ground back to clean fibreglass and then the fun can start of rebuilding the inside of the boat.
Sunday, 1 November 2020
Motor launch conversion coming along around the rain and foul weather.
Progress on the motor launch conversion is coming along around the rain and foul weather as best as I can at the moment as the workshop and the other temporary workshops are full of boats at different stages. So until one or all get to a stage that there can be a major stage of change of position. We have to work round the weather. So far this past week we were able to remove most of the fittings holding the outer keel to the bottom of the boat. However, some are a little more difficult to remove and have to use different methods to remove them. Once they are removed then lifting the boat up and giving some clearance under the boat we should be able to remove the keel. That is plan "A" watch this space to see how we get on with that plan.
Also, We are getting on well with the removal of the rowlock positions which are no longer required and have remove them and re=profiled the capping to look like the rest of the capping and have gone well on removing all the old paint off the gunwales and capping. Just got to clean up the corners, knees and thwarts and then that job can be put to one side while we get on with clearing up the inside of the hull and make up the engine beds and reposition the original floor bearers and make up new floor bearers as we need then when fitting the new engine beds in the hull.
Thankfully because I can get on with much of the work myself, I will be able to keep going if a little slower without my part time worker. While this latest lockdown is in place.
Back to the Cornish Crabber and fitting the lower mast support post.
The support post is being held in position a pair of clamps while the epoxy resin/glue cures over the next few days and then the epoxy resin/glue will be sanded back and then a series of epoxy fillet will be profiled into the area at the front of the centreboard case and at the bottom of the post so that the fibreglass will be able to follow the curves and lay flat without ant air pockets in the layup as it goes around the many curves.
Once the support post is all fibreglassed into position the top of the post will be cut to is final height and the stainless steel upper part of the support post which will take the mast pressure coming down through the deck via the deck beams and also the lifting tackle that is going to be fitted to the support post as well.
Once the mast support post is glassed into position then, it will be time to turn our attention to to support knees on the two sides of the centreboard case and fitting the deck beams and making the upper support post to be fitted to the lower part of the support post.