Monday, 20 April 2020

Camper van repairs coming along

Now that some of the parts are close to their final shape it is time to start using profile filler to get the parts back to their original shape 


Once the profile filler as cured then comes the long job of re-profiling the final shape 


Now starting to fill and fair some of the parts that will be put back on 


Starting to profile filler the parts that are in need of fairing up before refixing in position 




One part that is just in need of a small amount of fine profiling and will be ready to be painted and then refitted 



Patterning and fitting chain locker bulkhead

Making and jig out of off cuts of thin plywood  so it fit closely the shape of the hull and then spoilt off with a spoilt marker and pencil 


Then transfer the marks to a piece of 18 mm plywood 


Then loosely fit to the place where it is going to end up in its final position 




Fitting the fuel and watertanks in position in thelazarette locker

Fitting the floorboards in the lazarette locker so making a good platform for the fuel and water tanks to sit so there is not a lot of room to move about in the locker 


The fuel tank is a good fit between the floor panel and the deck head


There is a bit more room between the under side of the deckhead on this so it is going to need more bracing to hold it in position and not move about 


Saturday, 18 April 2020

The foredeck beams are now dry fitted and once the chain locker bulkhead is in position they will be fitted

Having fitted the first 2 deck beams it was time to fit the last of the full length deck beams on the foredeck of the Cornish Crabber 


This was done with the help of a very long spirit level 


The second deck beam fitted into its socket which is moulded into the hull 


A good tight fitted and only needs to be bedded down on sealant and a fixing put in it to fix it in position


Slowly fitting the last of the 3 deck beams in to its socket 


All 3 deck beams fitted and now just need to remove them and put to one side and then get on with the chain locker bulkhead.



Thursday, 16 April 2020

The crabber refit underway at last

The first job was to clear out the inside and get rid of any hazards and loose crap on the bottom of the hull so I could see what as to be done to reinstate the centreboard case  


Now it is a lot clearer so I can see what is to be done 


Starting to fit the deck beam ends 




Having to cut away a fair bit at the very end to get the deck beam to come level with the deck flange 



Finally the first deck beam is in the correct position and ready to dry fix with a pair of screws.