Monday, 10 February 2020

Cornish Crabber rebuild getting underway

Sorting out the sockets where the ends of the new deck beams are going to be located into when they are made



A bow shot where a new deck beam as to be made and fitted where there was not one before, the latest owner wishes to have a good connection between the deck and the top of the chain locker bulkhead 


The original deck flange which the new deck is going to be fixed too 



A large void space at the moment, however, it will soon be filled up with bulkheads and engine and tankage 


Just setting up the deck beam building jig to laminate the new deck beams  


A large void space looking forward the same thing is going to happen with this space it will get filled with bulkheads and other items as the boat gets rebuild


Thursday, 6 February 2020

The fuel tank back from the fabricators and the flow coating finished on the bulkheads

The fuel tank now as the feed take off in the correct position and the tank as the correct size vent pipe take off as well 



The sight pipe fittings have been remade as they were loose and would have leaked 


The flow coating of the bulkheads now finished and ready to go on to the next stage.