Wednesday, 11 September 2019

Busy day at the yard and in the workshop

The continuing cutting back of the bottom of the multi diagonal bottom speed boat, now got to the end of the rotten wood and now time to clean up the edges before the re-building starts   


The fore and aft bulkheads will have to replaced and reinforced before re-building the hull


This side will have to have the bulkhead re-instated 



Last, but one coat of Gelshield treatment and then the other work can start on the boat's interior and glassing up vholes around the boat's hull and deck



The first coat of deck paint on the deck before the fittings start to go back on the deck and the varnishing of the top plank and rubbing strake can continue. 


Sunday, 8 September 2019

A busy few weeks ahead

Now that I am back to working by myself, there is a lot of jobs that are going to take my time up and mean I am going to be doing a lot of long hour days to keep up with the workload I have got in the yard.

However, when some of the projects that are in the yard are finished there is going to be time and space to re-organise the yard and the workshop. This is something that as needed to be done for sometime and not had the time or money to do.

The projects that are going to be worked on over the next few months are ones that will take a long time to complete and the owners are not in a rush to have done as their plans to have the boats sailing  at sometime over the next year or so.

So the first job tomorrow is to sit down and work out a plan to sort out the yard and sort out the workshop to make the most of the available space and get rid of any unused equipment and other items laying around that are stopping me from working as well as possible.

So now the hard work starts to re-build the business and get it working the way I need it to run.

Saturday, 7 September 2019

Other project boats in for work over the winter months

A multi diagonal bottomed speedboat in need of major hull repairs in the aft sections and the transom


A finesse 24 in the final stages of a re-decking job with just the deck fittings and deck painting with non slip deck paint 


A dinghy in need of its centreboard case fitting 


The next winter project boat and complete re-build of a Cornish Crabber from the keel up 




Finesse 24 rubbing strakes back on and then the fun begins with the deck fittings going back on

Now the rubbing strakes are back on the screw holes will be plugged with hardwood plugs of the same wood as the rubbing strakes.


Once the screw holes are plugged and sanded back the whole area will be varnished 


Now it is a matter of fitting the deck fittings and screwing the new quadrants to the cabin sides and varnishing them  



Wednesday, 4 September 2019

The finesse 24 started to get its new painted decks and two new projects boats to get underway later in the month

The Finesse 24 is now started to get its new deck painted with primer before being painted with deck paint when the four coats of primer are applied 



A Cornish Crabber in the yard fora full refit from the keel up 



A multi diagonal bottom speed boat in for a couple of new sections of bottom and lower transom