Monday, 11 February 2019

Jasmine Now back at her owners sailing club

Already to go to her owners sailing club with all the work completed and now ready to be put back in the water for a trail sail


Back at he sailing club and about to be rigged for the first time in  over a decade With new standing rigging and a reasonable set of sails. 



Did not have the chance to take any photos of the boat rigged, however the owner did get a chance and when able will put them on the blog.
The trail sail when well and the owner is happy that after a long time he finally as the dinghy afloat and is going to be able to use the dinghy over the coming months and years.

Saturday, 9 February 2019

Jasmine ready to go home and the mock-up Hardy 25 Helmsman seats and storage boxes made

Jasmine now ready to go home to her owner's sailing club next week 


A major amount of work done this time with some more ribs and a new outer keel and the centreboard case removed and re-sealed and the mast support renewed.


The owner hope to sail her in the spring when it gets warmer and there is more time in the evening to go sailing after work.



The mock-up of the helmsman seats is now done and have been put in place in the cockpit, now have to make up the foot rests to put on the front of the boxes which are having to be mocked-up to the original design when they were made by Hardy Marine when these boxes were original made as an option for this boat.



Tuesday, 5 February 2019

All change around in the workshop and yard

The little Mai dinghy is in the workshop for some more work to be done on her while we wait for the next project to the yard for work to be done on her before the spring.


The day motor launch is back in for a few small jobs to be done before it is ready to go back on the owner's moorings


One of the small jobs to be done is to refit a new bilge pump in the aft well in the cockpit floor


Also the ongoing repairs to the GRP trailer front which is now get closer to getting finished and returning to its owner to put back on his trailer. 


Monday, 4 February 2019

The Finesse 21 transported back to be antifouled and rigged and re-launched

The Mast lowered and ready to load on to transport 


The Finesse 21 loaded on to transport outside our yard and ready to strap down on to the transport 


Now at the boatyard from where she was picked up and now returned to for antifouling and rigging and re-launching 


Thursday, 31 January 2019

Other jobs underway

Ongoing repairs to the trailer front


The small launch to get a few small jobs to do and that will be going back to the owner.