Thursday, 10 August 2017

Cleaning out workshop and getting boats in for repairs

The main problem is where to start with cleaning the old things you do not need any more

Got to start somewhere it might as well be the shelves and then that will make room on the floor for boats and the other equipment like bandsaws, table saws  and pillar drills and other heavy equipment. 


Two new larch boards to repair the clinker dinghy will have just got in for repair


An old GRP dinghy will have got in to restore 


The clinker dinghy which needs two new planks 


Monday, 7 August 2017

Life as come full circle doing the same job I was doing when I started boat building 40 years ago

Repairing a clinker dinghy simply to the type I helped repaired forty years ago 


Replacing two split planks 


The fun job of grinding off the roves on the plank lands so I can remove the planks and use them as spoil boards for the new planks   






Sunday, 6 August 2017

All change in the workshop with a new set of project boats in for work to be done.

Three boats that at stages in the past have had bits of work done on them and now that one boat as gone there is room for these projects to be finished off under cover.


The Shetland Family Four now in the Workshop for its cabin linings to be fitted and then the windows, then the logos and then put up for sale.


The 8 ft dinghy mould and dinghy in the mould ready to come out and be fitted out and put up for sale then another can be moulded 


At long last the Mai-Star Class dinghy is at the workshop and ready to be finished off.


Saturday, 5 August 2017

The Finesse is now out of the workshop to make room for other projects to get started on and other projects finished off


Getting the workshop around the boat cleaned and ready for the long day of boat moving 

All ready for the off 



wooden rollers under the boat to aid moving around the workshop to the doorwayu


A bit of heavy machinery to aid the movement of the boat out of the workshop 



squaring it upo in the doorway ready to get it on a trailer to transport it to its new home



 Finally on the trailer ready to be towed to its new home 


Thursday, 3 August 2017

A good days work on the Shetland Family Four

Cutting out the new carpets and cabin side linings 
 a bit of a long job, however the end result will be worth it in the end

The cabin side linings to be vinyl instead of cloth linings to be able to kjeep clean easier in the future


The cabin roof linings going on new plywood panels as the old panels were beyond being reused



The smaller of the roof panels propped up in position 



The navigation lights now finished off 



The plywood panels before being covered with the new vinyl linings