Thursday, 1 December 2016
Tuesday, 29 November 2016
Monday, 28 November 2016
finally got Little Mai in the workshop and now ready to fit her out.
Finally got the mould with the dinghy in the workshop ready to make a start on fitting her out
First dry fitting the stern seat before make the transom pad for the outboard and then glass in the seat
Dry fitting the bow seat, however before the glass in this bow seat in, there is the fitting of the bow eye bolt
Let the fun begin
Saturday, 26 November 2016
Friday, 25 November 2016
Starting to get back to work on Mai-Star II after a long break from been able to work on her
Working on making a new forehatch
Another job to sort out the top of the transom
Sort out the coamings around the cockpit sides
Make a gas bottle locker to keep the gas bottle from moving round the cockpit while at sea
The varnish work on the inside of the cabin as stood well after been left for a long period of time
The broken deck beam that needs replacing before the new deck can go back on a job with top priority
The mast step that needed replacing at the same time as the deck beams
A new rib needed to be made and steamed into place as one of the jobs over the winter
A lot of painting and varnishing to be done over the winter months as well both on the inside and outside.
Subscribe to:
Posts (Atom)



















