Three more planks put on the bottom so the hole is getting smaller.
Friday, 10 October 2014
Getting more planks on the bottom of Reveller
Wednesday, 8 October 2014
Getting to grips with a poorly done repair to the bottom
This repair to the bottom is a poorly done repair and is very dangerous in that it does not have any strength in it and the first time the boat was put under any stress would fail and the boat would founder.
Getting the bilge keel off so can get to the rotten planks
Getting the nuts off the bolts holding the keel on
Some came off , others on the other hand did not and had to be cut off with an angle grinder
They all came off and the keel did come off the bottom
The keel coming off with the add of a few hardwood wedges
Tuesday, 7 October 2014
Back to Long Eaton for another week in the rain this time.
Cutting a new scarf joint on another plank ready to fit a new length of plank to the port side
Putting a cover over the boat where I am working on doing the hull repairs, so I can keep working while it is raining as it is forecasted for the rest of the week.
At least I can keep working and the boat will keep dry or at least this part of it will be.
Saturday, 4 October 2014
Working on Reveller is coming on a pace.
End of this week saw the new chine rail made and fitted. So now the new bottom planks have somewhere to fix too.
The new chine rail in position
The odd set back in the form of a bit of rot in the bottom part of the aft end of the engine bearer which needs cutting out and replacing with new wood.
This photo is of the first fur planks fitted to the bottom and before the first of the side planking starts to go on.
The new ribs and frames back in position and so the planks have good wood to fix too in the future
.
.