Tuesday, 15 October 2013

Down at the workshop and a list of jobs to do on the client's boats

This week it is a bit drier than last week and now we can get outside on the clients boats that are out side in their different locations around the county. Having spent the last few days doing work on their boat with small interior work that needed doing on the parts of their boat that we had in the workshop to do while the weather was aganist us working outside.

Hopefully now that we have a couple of days of dry weather we can get on with work on their boats where they are. The lists of jobs to do on the boats are very different from boat to boat and will challenge our skills to complete them and we at J-Star enjoy a challenge. Two of the main jobs at the moment are the refits of a Princess 25 and a Hardy Navigator 18 which boat need a great deal of work on to bring them both back to a good condition and ready to take to the high seas again.

As well as these two boats we have a number of smaller dingies to work on to bring them back up to serviceable condition and also to build a new dinghy over the winter. So we are presently busy which is a good sign that the industry is picking up once more. 

Saturday, 12 October 2013

This week has been a mixed bag of different jobs from small ones to bigger ones around the weather.

This week has been a mixture of doing what you can round the weather. Everything from delivering boats back to their owners to gluing little bits trims to doors on another boat and many things in between.

At the beginning of the week it was all change at the workshop with the turning over and putting back on the trailer of "Jasmine" and taking it back to its owner's home. So he can do the painting and varnishing on the boat over the winter.

Then it was the turn of the Enterprise to take its place where "Jasmine" was and start her restoration for the next few months. This has now been started and is well underway with the deck having been removed as well as the damaged and rotten hull panels.  So that can be worked on when the weather is against us working outside.  Other work do on the Enterprise restoration was the removing of the old varnish off the seats and thwarts and other smaller items of the boat that need sorting out while the other member of the company is doing other work on other projects.

Also this week there was a start made of the work list on Mai- Star II with the removal of the broken ribs on the port hand side and the doubling ribs. Also the removal of the damaged planks in the cockpit on the port side. So this year the main thrust of the work on the boat will be on getting the port side of the boat sorted out and getting the cabin and roof re-instated ready for the new season.

There was work done on the little Hardy Navigator "Me Time" in the way of getting it on its trailer and making up some chocks to fit the trailer so it can be transported to the workshop. Once there the long list of jobs to do on its refit list can begin. The first of which is going to be to get a cover sorted so it can keep it dry while it is being worked on.

Other work done this week was to trim the galley and toilet compartment doors so they can be have the trims varnished. Also done now are the cockpit wheelhouse trims which fix the wheelhouse roof to the new wheelhouse windows.

So next week it is going to be another mixed bag of jobs and a step closer to get all the projects to the finished condition ready for next season.

Wednesday, 9 October 2013

The one thing about being a boat builder is that every day is different, well most of the time.

The main thing with being a boat builder is that you get to work on a lot of different boats and meet a lot of different people along the way.

One day you could be painting the bottom of a boat the next you could be changing windows in a narrow boat, or even removing planks out of a wooden yacht. So every day as its new challenges and way of getting the job done. The only time it get a little problematic is when you have to work outside and the weather is either damp or raining.

Today's job is to remove and reseal a couple of windows in a narrow boat. This is a bit of a messy job as removing the sealant and putting new sealant on the windows can get a bit messy and needs a lot of cleaning up. When the job is done they should be good for a number of years to come.

Monday, 7 October 2013

This photo shows "Jasmine" before it was turned over, so that it could be put back on to its trailer for its road trip back to its owners home for him to finish off the painting and varnishing over the winter months.
 
This photo shows "Jasmine" back on its road trailer ready to go back its owners home for him to finish off the hull over the winter, then back in the spring to have a new deck fitted.
 
Now that "Jasmine" is finished for the time being, it is the turn of the Enterprise to get the restoration treatment on her to bring her back to a sailing condition once more over the next few months, so she to can get sailing again.

 
The first job on the Enterprise is to clean up the frame work and the gunwales and replace the rotten and damaged port side gunwale with a new spruce  guwale and then replace the two top hull panels on both sides of the hull.

 

Sunday, 6 October 2013

This week will see a change in the boats that we are currently working on.

This coming week will the end of some long term projects and the begining of new projects to see us through the wnter into the spring. The work on the Enterprise dinghy restoration will be the first of the homebase projects and once that is completed then the new dinghy will be started on and to be completed for the spring season. Other works planned are a couple of Hardy Marine cruisers to work on, one is in need of some major TLC and the other is in need of some repairs following a accident in which parts of the boat were damaged and are in need of replacement and a general clean up.

As well as these project I have a narrowboat to sort out its windows and other small jobs to do before the weather turns for the winter. Also an ongoing project on a Princess 25 which is in the middle of a full restoration back to its former glory and will be back in the water for the new season next year.

While all this is going on I have a classic 1940's yacht to finish and get back into sailing condition and back afloat. So the next few months are going to be busy with projects and general work.

As with all other projects there will be a weekly update in the form of photos and text to keep you all informed of the progress of the projects.