Saturday, 12 October 2013

This week has been a mixed bag of different jobs from small ones to bigger ones around the weather.

This week has been a mixture of doing what you can round the weather. Everything from delivering boats back to their owners to gluing little bits trims to doors on another boat and many things in between.

At the beginning of the week it was all change at the workshop with the turning over and putting back on the trailer of "Jasmine" and taking it back to its owner's home. So he can do the painting and varnishing on the boat over the winter.

Then it was the turn of the Enterprise to take its place where "Jasmine" was and start her restoration for the next few months. This has now been started and is well underway with the deck having been removed as well as the damaged and rotten hull panels.  So that can be worked on when the weather is against us working outside.  Other work do on the Enterprise restoration was the removing of the old varnish off the seats and thwarts and other smaller items of the boat that need sorting out while the other member of the company is doing other work on other projects.

Also this week there was a start made of the work list on Mai- Star II with the removal of the broken ribs on the port hand side and the doubling ribs. Also the removal of the damaged planks in the cockpit on the port side. So this year the main thrust of the work on the boat will be on getting the port side of the boat sorted out and getting the cabin and roof re-instated ready for the new season.

There was work done on the little Hardy Navigator "Me Time" in the way of getting it on its trailer and making up some chocks to fit the trailer so it can be transported to the workshop. Once there the long list of jobs to do on its refit list can begin. The first of which is going to be to get a cover sorted so it can keep it dry while it is being worked on.

Other work done this week was to trim the galley and toilet compartment doors so they can be have the trims varnished. Also done now are the cockpit wheelhouse trims which fix the wheelhouse roof to the new wheelhouse windows.

So next week it is going to be another mixed bag of jobs and a step closer to get all the projects to the finished condition ready for next season.

Wednesday, 9 October 2013

The one thing about being a boat builder is that every day is different, well most of the time.

The main thing with being a boat builder is that you get to work on a lot of different boats and meet a lot of different people along the way.

One day you could be painting the bottom of a boat the next you could be changing windows in a narrow boat, or even removing planks out of a wooden yacht. So every day as its new challenges and way of getting the job done. The only time it get a little problematic is when you have to work outside and the weather is either damp or raining.

Today's job is to remove and reseal a couple of windows in a narrow boat. This is a bit of a messy job as removing the sealant and putting new sealant on the windows can get a bit messy and needs a lot of cleaning up. When the job is done they should be good for a number of years to come.

Monday, 7 October 2013

This photo shows "Jasmine" before it was turned over, so that it could be put back on to its trailer for its road trip back to its owners home for him to finish off the painting and varnishing over the winter months.
 
This photo shows "Jasmine" back on its road trailer ready to go back its owners home for him to finish off the hull over the winter, then back in the spring to have a new deck fitted.
 
Now that "Jasmine" is finished for the time being, it is the turn of the Enterprise to get the restoration treatment on her to bring her back to a sailing condition once more over the next few months, so she to can get sailing again.

 
The first job on the Enterprise is to clean up the frame work and the gunwales and replace the rotten and damaged port side gunwale with a new spruce  guwale and then replace the two top hull panels on both sides of the hull.

 

Sunday, 6 October 2013

This week will see a change in the boats that we are currently working on.

This coming week will the end of some long term projects and the begining of new projects to see us through the wnter into the spring. The work on the Enterprise dinghy restoration will be the first of the homebase projects and once that is completed then the new dinghy will be started on and to be completed for the spring season. Other works planned are a couple of Hardy Marine cruisers to work on, one is in need of some major TLC and the other is in need of some repairs following a accident in which parts of the boat were damaged and are in need of replacement and a general clean up.

As well as these project I have a narrowboat to sort out its windows and other small jobs to do before the weather turns for the winter. Also an ongoing project on a Princess 25 which is in the middle of a full restoration back to its former glory and will be back in the water for the new season next year.

While all this is going on I have a classic 1940's yacht to finish and get back into sailing condition and back afloat. So the next few months are going to be busy with projects and general work.

As with all other projects there will be a weekly update in the form of photos and text to keep you all informed of the progress of the projects.

Wednesday, 2 October 2013

Volvo Penta sterndrive overhaul.

This photo is of the sterndrive from the Princess 25 now off the boat after a battle with nature after it had been on the boat for 30 years.
 This photo shows that we are making a start to dismantle it.
 
This photo shows the old anode showing it was doing its job. 
 
The business end of the leg unit in need of a bit of TLC and a repaired propeller before it is put back into commission
 
This photo shows the transom shield removed from the leg unit after a battle to get the pivot pinds out of the transom shield.
 The leg unit at last removed from the transom shield and will be able to work on it easier.
 
This photo shows what 30 years of being in the water can do to serial number badges
 
This photo shows the exhaust coupling removed for cleaning and replacing the rubber o ring.
 This photo shows the hole where the gear shift cable goes through which was U/S and needed replacing due to old age

 
 The ram unit to trim the leg
 
This photo shows the pivot pin hole which was a battle of wills to get the old one out
 
The transom shield in need of a bit of TLC