In order to save time we loaded the rudder, anchors, the chain and the fuel tanks on to the cradle so they are off the workshop floor before move the yacht out of the workshop and that way there is nothing on the floor to stop the yacht move across the workshop floor.
The fuel tanks on the front of the cradle under a cover to keep the dust out of any opening in the fuel tanks
Doing some small repairs to the lazarette hatch where the catch as to be moved to be able for it to be used.
The main cabin sliding hatch and the rudder stock top bearing cover just need an extra coat of cream gloss paint
The outside edge of the toe rail all maked up ready to be filled with black sealant to ensure the edge is sealed
The inside edge of the toe rail having the same treatment to ensure that is sealed as well.
The rain water drainer just need lifting out and get sealed at the same time as the toe rails aresealed.