Saturday 27 July 2024

The Morgan Giles 30 is now out of the workshop awaiting transport for the next stage in her refit.

Setting the block and tackle to start the move out of the workshop into the yard.


The headroom between the cabin sliding hatch was just 12mm clearance.


Halfway out and pass the high part of the cabin sliding hatch


The high spot from a different angle, is it gong to get out under the door beam.


Pass the high point and the concrete is flat and level so the boat can move easier than when it came in 5years 5 months and two week ago.


Finally she's out in the sunlight.


Just waiting for transport to take her to other boatyard to get her mast stepped and her engine fitted.


 

No comments:

Post a Comment