Sunday, 21 July 2024

The 8 ft dinghy build is coming along well.

The hull is now cured and removed from the mould ready for the next stage.


Mould the two seats which are the buoyancy tanks for the boat 



Once the seats were released from their moulds they were trimmed back to the correct size and wedged into position so they can be glassed into place



Also the gunwales have been nailed in place and the top edge of the hull is leveled off with the top of the gunwales 




 

No comments:

Post a Comment